+86-0532-67785844     +86-18853290016          sales@grwaautomotive.com   

Support

  • Q How to make sure the airflow of the muffler is smooth and the sound effect is stable?

    A When packing the interior , we wrap the stainless steel wire outside the perforated pipe firstly, then wrap the heat-insulated non-woven fabrics and blanket firber glass.
  • Q How can you guarantee the exhaust muffler is enough strong and durable?

    A We weld the muffler three times with the 316L welding wire to keep it strong.
  • Q Can you produce the muffler according to my sample?

    A Yes, we have specialized technical research and development team, can design drawing, make the tooling and check fixture.
  • Q Can you make our logo on the muffler?

    A Yes, we can make the logo with different style, such as laser, stamp, rivet, Laser hollowed and so on.
  • Q What is the MOQ?

    A 20pcs can be accepted.
  • Q How about your delivery time?

    A Generally, it will take 25-30days to produce the exhaust mufflers after receiving your deposite.
  • Q What is your terms of payment?

    A We can accept T/T, Paypal and Western union. 30%-50% as deposite and 50%- 70% before delivery.
  • Q How to make sure the airflow of the muffler is smooth and the sound effect is stable?

    A When packing the interior , we wrap the stainless steel wire outside the perforated pipe firstly, then wrap the heat-insulated non-woven fabrics and blanket firber glass.
  • Q How can you guarantee the exhaust muffler is enough strong and durable?

    A We weld the muffler three times with the 316L welding wire to keep it strong.
  • Q Can you produce the muffler according to my sample?

    A Yes, we have specialized technical research and development team, can design drawing, make the tooling and check fixture.
  • Q Can you make our logo on the muffler?

    A Yes, we can make the logo with different style, such as laser, stamp, rivet, Laser hollowed and so on .
  • Q What is the MOQ?

    A 20pcs can be accepted.
  • Q How about your delivery time?

    A Generally, it will take 25-30days to produce the exhaust mufflers after receiving your deposite.
  • Q What is your terms of payment?

    A We can accept T/T, Paypal and Western union. 30%-50% as deposite and 50%-70% before delivery.
Follow us
Please Enter Your Information
3 +86-18853290016
    +86-18853290020
    +86-18853290028

    +86-18853290130
    +86-18853290058

 sales@grwaautomotive.com 
   

Exhaust System

Intake System

QUICK LINK

© 2019 QINGDAO GREATWALL INDUSTRY CO., LTD.  ALL RIGHTS RESERVED.